DIY Backyard Designs
Home / Plans / Lift-Top Storage Coffee Table

Lift-Top Storage Coffee Table Plans

Two tops in one table: a lift top and a sliding top, each over its own storage bin.

Lift-top storage coffee table closed, 3D render of the plan model
Closed
Lift-top storage coffee table with the lift top raised and the slide top open, 3D render
Lift top raised and slide top open (3D render)

A two-in-one storage table. The lift top rises toward you to standard table height, and a solid-wood top with a routed border groove slides sideways to open a second bin.

Finished size
48 L × 22 D × 20½ H in on the lift-top side (16½ in on the slide-top side)
Skill level
Beginner to intermediate
You get
14-page PDF (US Letter) plus a separate 17 × 11 plan sheet
Format
Digital PDF download (US Letter). Imperial measurements.
Coming soon

Buy this plan

Checkout isn’t open yet. Leave your email on the contact page and we’ll let you know when it is.

Who this plan is for

This plan is for confident beginners and intermediate builders who are ready to rip plywood accurately, cut a step and two notches with a jigsaw, and install drawer slides squarely. Plan on about 8 to 12 hours of shop time for a first build, plus drying time for glue and finish.

What’s included

Materials overview

Hinge kits and slides vary, so the plan asks you to buy the hardware first and check it against the hardware fit page before you cut. The shopping list has a price column you fill in for your area. The main materials:

Tools you’ll need

How this plan is different

Common questions

Which hinges and slides do I need?

The plan is written around a pair of lift-top hinges and a pair of 18 in full-extension ball-bearing slides. Hinge kits vary in folded size, rise and how far they travel forward, so buy the hardware first, check it against the hardware fit page and dry-fit before you finalize any screw holes.

How high does the lift top rise?

About 28 to 30 in off the floor, which is standard table height. The exact height depends on where you mount the hinges.

Do I need a router?

Yes. A router with a ½ in core-box bit cuts the border groove around the slide top.

Can I sit or put heavy things on it?

No. Do not sit or stand on either top, and keep loads on the open slide top light, such as a laptop, books or a plate.

How long does it take?

Plan on about 8 to 12 hours of shop time for a first build, plus drying time for glue and finish.

Good to know

Not an engineered design. Check your hardware against the fit page before you cut.
Digital PDF download only. You’ll receive printable plans, not a finished project, a kit or materials. For your own personal build. Please don’t copy, share or resell the PDFs.

← All plans